Projects Karara

Project: Karrara Iron Ore Project
Location: Australia
Client: Karara Mining Limited
Year: 2014/2015

Two 100 m3 liquid flocculant and coagulant tanks with a distributed dosing system were installed in the Midwest region of Western Australia. Both tanks had internal capacities of 131 m3 each with the coagulant tank being insulated and heat traced. Stainless transfer piping with insulation and heat tracing was also installed. The project was a Turn-key: civil, mechanical and electrical contract.