Project: Lynas Rare Earths
Location: Kalgoorlie
Client: Lynas
Year: 2022
Lynas Rare Earths commissioned a 700m3 recoverable capacity bolted silo with five sections designed to minimise site assembly time. The support structure was pre-fabricated with four bolt-together frames and placed on load cells for accurate weight measurement. The system included a 4.0m bin activator and a weigh screw for continuous throughput measurement. A 2.1 x 4.2m packaged roller mill was also installed as part of the setup.
Support structure pre fabricated, 4 bolt together frames. On load cells.
- 4.0m bin activator
- Weigh screw (continuous throughput measurement)
- 2.1 x 4.2m packaged roller mill